Orchard Park High School Project Overview
Orchard Park High School Project Work
-
Project Work
- Replace the existing artificial turf field which is at the end of its useful life.
- New home team bleachers and press box on the east side of the field.
- Relocate existing visitor bleachers by moving from the east side of the field to the west side.
- Replace the existing athletic field lighting with new athletic field lighting.
- Demolish the existing locker room & concession stand building and construct a new concession stand building which will include locker rooms, restrooms and storage.
- Regrade existing sod football practice field to include new drainage.
- New music wing addition. The addition will include: a new band room, practice rooms, toilet rooms, and an elevator.
- Demolish a portion of the existing parking area.
- Regrade site for new soccer field.
- New parking area directly adjacent to new pool area.
- New pool addition. The addition will include: pool, locker rooms, fitness/weight room, and seating for 600 spectators.
Pool and Fitness Area at Orchard Park High School
-
Future Pool and Fitness Room at Orchard Park High School
The Educational Improvement project includes a new addition to replace the current high school pool. The new pool will allow the district to host Sectional and ECIC events and offer community access during non-school hours. The addition will include a fitness room overlooking the new pool. The current Orchard Park High School pool was constructed in 1959 as a gymnasium; in 1976 it was converted to a pool. The pool's current systems are at the end of their useful life. Once the new pool is complete, the old pool will be converted into a physical education space.
High School Music Department Addition Overview
-
Future High School Band Room