Orchard Park High School Project Overview

Orchard Park High School Project Work

  • View from above the Orchard Park High School Campus

    Project Work

    1. Replace the existing artificial turf field which is at the end of its useful life.
    2. New home team bleachers and press box on the east side of the field.
    3. Relocate existing visitor bleachers by moving from the east side of the field to the west side.
    4. Replace the existing athletic field lighting with new athletic field lighting.
    5. Demolish the existing locker room & concession stand building and construct a new concession stand building which will include locker rooms, restrooms and storage.
    6. Regrade existing sod football practice field to include new drainage.
    7. New music wing addition.  The addition will include: a new band room, practice rooms, toilet rooms, and an elevator.
    8. Demolish a portion of the existing parking area.
    9. Regrade site for new soccer field.
    10. New parking area directly adjacent to new pool area.
    11. New pool addition.  The addition will  include: pool, locker rooms, fitness/weight room, and seating for 600 spectators.

     

Pool and Fitness Area at Orchard Park High School

  • Future Pool and Fitness Room at Orchard Park High School

    Rendering of pool and fitness room

    The Educational Improvement  project includes a new addition to replace the current high school pool. The new pool will allow the district to host Sectional and ECIC events and offer community access during non-school hours.  The addition will include a fitness room overlooking the new pool.   The current Orchard Park High School pool was constructed in 1959 as a gymnasium; in 1976 it was converted to a pool.  The pool's current systems are at the end of their useful life.  Once the new pool is complete, the old pool will be converted into a physical education space.

High School Music Department Addition Overview

  • Future High School Band Room

    Rendering of High School Band Room